Showing All

LCRP Level Crossing 4D Planning Review

The City of Melbourne has been undergoing a very large works program to remove 85 existing rail level crossings or roads by means of grade separation. This generally entails construction of grade separated road and rail alignments by means of elevated bridges or trenching and demolition of existing redundant assets.

RASP was engaged to complete 4D Integrated risk review of project by linking the construction schedule at the Noble Park Station. Stakeholder engagement was a key factor in reviewing the traffic flow and construction activites.

Rasp Competitive Advantages

  • 100% privately Indigenous Owned Company
  • National Footprint
  • Knowledge of Vic Standards
  • Inhouse Design and Drafting Services
  • Locally Resourced Employees

Australian Private Networks (APN) – Wi-Fi and Telephone Service Rollout

Comprehensive assessments were conducted to confirm that newly installed Wi-Fi and telephone services met all specified requirements. These reviews focused on three key criteria:

Infrastructure & Technology Characteristics


Verifying that each asset adheres to the outlined specifications in all material respects.

  1. Fitness for Designated Use

    Confirming that each asset delivers the intended functionality and reliability for community members.
  2. Statutory Compliance

    Ensuring that all installations meet the relevant legal and regulatory obligations.

Site Visits

  • Onsite Documentation

    Field visits were carried out to capture photographic evidence and detailed data records of each Wi-Fi and telephone installation.
  • Towers & Antennas

    Locations and conditions of newly installed or existing towers and antennas were carefully noted and recorded.
  • Home & Building Inspections
    Every home or building with installed equipment was entered on foot, photographed, and evaluated. Comprehensive checklists were completed to ensure consistent, thorough data collection.

Explore our services and learn how our expert reviews and site assessments can help your organization achieve seamless, compliant, and efficient telecommunication solutions in remote and challenging environments. We are committed to quality, accuracy, and community-focused outcomes—partner with us for your next connectivity project.

Woodman Point Waste Water Treatment Plant

We provided Electrical, Instrumentation, and Civil Drafting services to support the successful enhancement of this essential infrastructure, ensuring a reliable and efficient transition to cutting-edge sludge treatment technology. Our contributions included:

Electrical Design & Drafting

  • Detailed design of power distribution and control schematics.
  • Integration of new equipment with existing plant systems.

Instrumentation Drafting

  • Accurate instrumentation layouts and process control diagrams.
  • Seamless communication between sensors and supervisory systems.

Civil Drafting

  • Site layout, foundation plans, and structural details for new facilities.
  • Comprehensive design accommodating increased capacity and future scalability.

Explore our services and learn how our drafting and design expertise can help you achieve sustainable, efficient, and forward-thinking solutions for your Water and Waste Water Treatment Plant projects. We are committed to precision, quality, and client satisfaction—partner with us for your next engineering challenge.

Would you like more Information?

Contact us for a copy of our capability profile & case studies on previous projects.

Get in Touch